Week 33


I. PRELIMINARY INFORMATION:


A. CLASS: Networking

B. TITLE OF UNIT: Networks and Networking

C. TITLE OF LESSON: Cable Labeling

D. COMPETENCIES ADDRESSED: None

E. DATE & TIME:         

F. WEEK OF INSTRUCTION: 33

G. INSTRUCTOR: R Dorsey





II. OBJECTIVES:


When one looks into many cabling closets and even on the back of our computers, no one can know where the other end of the cable goes unless there is a label on the cable.


III. TEACHING METHODS AND TECHNIQUES:


Lecture Lecture Addendum

Other:       



IV. RESOURCES REQUIRED:


Other:      



V. INTRODUCTION:


This week is spent in preparation of cabling the Construction house built by the boys down stairs. The cables must be laid and installed according to some sort of plan of course and this week is about making that plan.



VI. CONTENT :


The construction trades house is ready for the installation of cabling. In order to accomplish that task, there must be some sort of a plan. This week is spent in preparation for the installation of the cables.

The early part of the week is spent after doing a site survey, on creating a network map, a house diagram with site installation details, and cable labeling database.


Cabling practice for house




VII. SUMMARY:



Real World installation of cabling at the construction trades house.



VIII. ASSIGNMENTS :




IX. LESSON/COURSE EVALUATION: